Single
acorn light standards will be installed on two major sidestreets
along El Cajon Boulevard. There will be 17 on Euclid Ave and 8 will
be added to 35th St. This project has been designed, but construction
funding was reporogrammed by the City of San Diego. The Association
is searching for additional funding.
The
Texas to 30th project was the final piece of a project spanning
almost 20 years, occurring over the watch of four different mayors
and four different City Councilmembers. The cost per block for the
first segment in the 1980s was under $100K, while the final per
block cost on the most recent project was closer to $140K


View
north from the Boulevard Transit Plaza of the future dedicated I-15
transit lane.

Timeline:
- June 2006:
Construction of the Boulevard Transit Plaza is completed. The
new plazas will eventually become a major hub, servicing the proposed
Metro Flyer bus rapid transit service along the Boulevard that
will connect San Diego State University and downtown via the Boulevard.
Also in the works is a bus rapid transit project along Route 15
that will link up the northern communities with downtown, passing
through the transit plazas. That project is anticipated by SANDAG
to be complete in about five years, with the east/west Metro Flyer
coming online sooner than that.
September 2005: Construction delays due to arch structure
redesign. The arches were found to be unstable the way they were
originally designed. Temporary braces have been intsalled while
a permenant fix is sought.
- December
2005: The supporting structure for the arches have been installed.

- October
2005: A model of a possible solution to stabilize the arche
straucture has been supplied by the project's design team.
- August 2005:
Arches and shade structures were installed.
- Construction
began in September 2004, and was expected to be completed mid-2005.

- After several
years of planning, a citizens advisory committee approved the
final design for improvements on both bridge decks over the Route
15 freeway at El Cajon Boulevard and University Avenue. The Boulevard
deck providea a shelter and kiosk, and will also have ornamental
and artistic features including night lighting and see-through
panels along the freeway edge to reduce noise. Additional components
like location maps, decorative tile and other art will be added
when funding is identified.

The final
section of the Boulevard median between Texas and 30th is now complete.
This marks not only the finish to this segment but also the completion
of the entire median enhancement effort between Park and Fairmount.
This final piece includes the reconstruction of left turn pockets,
reinstallation of the ornamental lighting, and introduction of tree
planting and ground cover.
The project
study area included the north and south side of El Cajon Boulevard
between 44th and 54th. The purpose of the project was to assess
the feasibility of improving the existing deficiencies and the associated
construction costs.
To fill the
void of lost neon signage, the spectacular Boulevard gateway sign
was erected in 1989 to return to the glory of neon. City officials
and local business leaders saw the sign as a major new landmark
which would promote the Boulevard as a destination and encourage
further community revitalization efforts. The sign was designed
and built by Graphic Solutions for a cost of $200,000. Click
here for more about the sign.
|
Date
|
Project
|
Cost
|
|
1980's
|
Median Landscaping- Park
to Texas |
$850,000
|
| |
"Boulevard" Sign at
Georgia |
$200,000
|
|
1990's
|
Median Landscaping- 30th to
805 (2 phases) |
$600,000
|
| |
Electrical Work on 805 bridge |
$7,000
|
| |
Cut, paving and install decomposed
granite around trees. |
$7,500
|
| |
People for Trees |
$25,000
|
| |
Ornamental Lights- Altadena
to 54th |
$70,000
|
| |
Medians Landscaping, Trees,
and Streetlights 805
East to Interstate 15 (2 phases) |
|
| |
1) 37th St- 39th St. |
$650,000
|
| |
2) 805-37th St. |
$900,000
|
| |
Ornamental Lights in Gateway |
$60,000
|
| |
Sidewalk Repairs- 805 west |
Project Completed
|
| |
Additional Ornamental Lights |
$50,000
|
|
2000's
|
MidCity Transit Gateways Project
|
|
| |
El Cajon Boulevard Transit Plaza
|
$1.9 Million
|
| |
Median Landscaping- Interstate
15 to 43rd St
|
$1.6 Million
|
| |
Street Trees Interstate 15 to
43rd St. |
Project Completed
|
| |
Ornamental Lights- Side Streets
Central to Copeland |
$150,000
|
| |
Ornamental Lights- 50th to Dawson |
$150,000
|
| |
Medians, Landscaping and Trees
Texas to 30th |
$1.2 Million
|
| |
The Boulevard Sign Repainted
|
Project Completed
|
| |
The Boulevard Streetlights Repainted
|
Project Completed
|
|
2010's
|
Euclid Ornamental Lights- Orange
to Monroe
|
Design Stage
|
| |
35th St Ornamental Lights- Orange
to Meade |
Design Stage
|
| |
Median Lighting Restoration |
Design
Stage
|
|