
![]() |
||
|
|
||
|
|
||
|
REPORTS AND STUDIES
|
|
The following reports are available to view at the Boulevard office. |
|
|
TITLE
|
Date
|
|
Mid-City
Comprehensive Parking Inventory
|
Dec-00
|
| Inventory of existing parking conditions. | |
| Source: The Mission Group | |
|
Euclid
Avenue Restructured Parking
|
Mar-01
|
| Alternative design concepts for Euclid Avenue between El Cajon Boulevard and Meade Avenue. | |
| Source: The Mission Group | |
|
Parking
Utilization Study
|
May-01
|
| El Cajon Boulevard from Park Boulevard to 70th Street parking utilization. | |
| Source: The Mission Group | |
|
Curb
Cut “Field Study”
|
Jun-01
|
| Identifies abandoned curb cuts that could be closed to provide more on-street parking on El Cajon Boulevard. | |
| Source: Mid-City Parking Community Parking District | |
|
Parking
Availability and Opportunity Summary
|
2001
|
| El Cajon Boulevard from Park Boulevard to College Avenue | |
| Adams Avenue from Mission Cliffs Drive to Van Dyke Avenue | |
| Source: The Mission Group | |
|
Parking
Inventories
|
Oct-01
|
| Adams Avenue Parking Inventory | |
| El Cajon Boulevard Parking Inventory | |
| College Area Parking Inventory | |
| Source: The Mission Group | |
|
Parking
Meters in Mid-City: Draft
|
2002
|
| Report on meter location and utilization. | |
| Source: The Mission Group | |
|
Parking
Meter Technology
|
2002
|
| Report on meter types and uses | |
| Source: The Mission Group | |
|
Parking
Utilization Study: Adams Avenue
|
Feb-02
|
| Utilization study of metered and non-metered spaces along Adams Avenue. | |
| Source: The Mission Group | |
|
Mid-City
Parking Study: Phase I Final Report
|
Jul-02
|
| Inventory, utilization, mobility options, best practices | |
| Source: The Mission Group | |
|
Mid-City
Parking Study: Parking Management Techniques
|
Sep-02
|
| Shared parking, in-lieu fees, and parking meter rates from various American cities. | |
| Source: The Mission Group | |
|
Comparison
of Parking Requirements in Zoning Codes for Redevelopment Zones in
Selected American Cities.
|
Sep-02
|
| Phase II research on zoning | |
| Source: The Mission Group | |
|
Hawley
Blvd Parking Patterns
|
Oct-02
|
| Before and after diagram utilizing various parking types. | |
| Source: The Mission Group | |
|
Side
Street Analysis
|
Nov-02
|
| Side Street Analysis Adams Ave from Park to Van Dyke and ECB from Park to Rolando. | |
| Source: The Mission Group | |
|
Mid-City
TransitFirst Study: Assessing Proposed Station Locations
|
Jan-03
|
| Analysis of proposed “Showcase” routes and alternatives. | |
| Source: The Mission Group | |
|
New
Parking Meter Locations
|
Jan-03
|
| Identifies key locations and phasing for additional meters on El Cajon Boulevard and Adams Avenue. | |
| Source: The Mission Group | |
|
Additional
Side Street Analysis: Parallel, diagonal and head-in parking comparison.
|
Feb-03
|
| Source: The Mission Group | |
|
West
Mountain View Drive Parking
|
Jun-04
|
| Analysis of ways to increase parking at the intersection of Adams and West Mountain View. | |
| Source: The Mission Group | |
|
Hawley
Boulevard Plan (updated)
|
Sep-04
|
| Median parallel parking analysis | |
| Source: The Mission Group | |
|
Adams
Avenue/Normal Heights
|
Sep-05
|
| Recommendations for Action. | |
| Source: The Mission Group | |
|
Adams
Avenue/Normal Heights (updated)
|
Nov-05
|
| Recommendations for Action. | |
| Source: The Mission Group | |
|
Formalized
tracking for Community Parking District requests
|
Nov-05
|
| Details and actions of requests for parking project requests made to the City of San Diego. | |
| Source: The Mission Group | |
|
Adams
Avenue/Normal Heights: Residential Parking and Related Issues Study
|
Nov-06
|
| Report on parking gains if side streets are converted to angled or head-in (90 degree) parking , speed sign locations and recommended pop out standards | |
| Source: The Mission Group | |
|
El
Cajon Boulevard Transit/Parking Survey
|
Jan-07
|
| Results of survey concerning Transit and Parking Issues on El Cajon Boulevard | |
| Source: Mid-City Parking Community Parking District | |
|
40th
Street Promenade Plan
|
Jul-07
|
| Design plan for 40th Street Promenade- A component of the Mid-City Urban Trail. | |
| Source: The Mission Group | |
|
Head-In
Parking Analysys Results
|
July-08
|
| Results of parking gains when converting to head-in and general angled parking. | |
| Source: Mid-City Parking Community Parking District | |
|
El
Cajon Boulevard &
Immediate Side Street Analysis |
May-09
|
| Parking Utilization Results for El Cajon Boulevard and Side Streets in the North Park Area. | |
| Source: The Mission Group | |
|
Kansas Street Head-In (90°) Parking Analysys
|
Aug-10
|
| Plan for converting Kansas Street to Head-In Parking | |
| Source: The Mission Group | |